HEALTHCARE

ST. PATRICK HOSPITAL – EMERGENCY DEPARTMENT

Final Contract: $926,500 (May 2008-Dec 2009)

This project was a remodel and expansion of the existing Emergency Department. When completed, the project doubled the size of the Emergency Department built in the mid-80’s. This project required extensive coordination as the Level II Trauma Center remained completely operational throughout the construction process. Each phase of the project was carefully planned and coordinated with the Owner, the Construction team, and the Design Team. With each phase of construction, new challenges were presented to maintain the existing Emergency Department services. Additional power was fed through and from the existing facility. This project included an extensive upgrade of many special systems including the Nurse Call system, the Fire Alarm system, and the Clock system.

COMMUNITY HOSPITAL OF ANACONDA

Final Contract: $1,324,000 (Apr 2013-Nov 2014)

The Community Hospital of Anaconda project was an expansion to the existing hospital facility. The project included a new 2000-amp 480V service requiring concrete encased duct banks. New parallel 250kw diesel generators, new lighting control and parking lot lighting, new electric-steam generators, operation rooms with isolation panels and equipment were also supplied and installed by Valley Electrical Contracting. The expansion project also included an upgraded Nurse Call system, Communications, Fire Alarm, Access Door Control, and Paging Systems.

The hospital, once completed, added a new roof-top heliport, three new operating rooms, accommodations for an additional operating room, a new MRI, a new sterilization room, a new pharmacy, and additional offices. The project also included extensive renovation and a remodel of some of the existing facilities.

Comments are closed.